Choose from over 5,000 Products

YOUR ONE STOP SHOPPING
for Environmental and Healthy Building Supplies and Home Comforts

Specs

Same Site
Same Great Service
New Look!!!

Visit our Specials page for the latest discounts.


Check out our Forum for information and ask our Official Support Team questions

Building for Health has undergone a makeover.
We still have the same quality products and superior tech support.
During our makeover we also expanded many product lines to make sure we are truly
One-Stop-Shopping.

Announcing the launch of Building for Health's sister site Whole Earth Living!!!

Whole Earth Living is a site dedicated to your health and the well being of the environment. They provide products that are organic, ecological, and improve your health.
Whole Earth Living

Building for Health
Materials Center
102 Main St.
Carbondale, Co 81623
800-292-4838
970-963-0437
e-mail

These instructions apply for any sealed or slick (smooth) surfaces. They also apply for any of the following surfaces (blueboard, masonry , concrete block, monolithic concrete, gypsum, cement stucco, lime, earth plaster, cob, adobe, AAC, or stone) which do not immediately soak up water misted onto it’s surface.

Maintain temperatures between 45 and 90 degrees Fahrenheit for 3 days before, during, and for 3 days after application.

Prepare wall:

Scrape back any flaking  or crumbling surface material until you have a solid, well bonded wall. On heavily textured surfaces, knock off the high points with a scraper. Any depressions greater than 1/8 inch and any mortar joints should be cleaned and leveled off with an appropriate material (for assistance in determining an appropriate filler, see the instructions for the material that has been sealed.)

If present, clean off any dust, dirt, grease, oil, and other foreign matter and deposits that could impair the bond with the plaster.  

Lightly sand any glossy surfaces to provide tooth for the primer, then rinse with TSP or a commercially available deglosser. Remove any remaining sanding dust prior to priming.

Check to be sure that outside corners have a slight radius or greater and correct if necessary.

Protect adjacent surfaces with painter’s tape, drop cloths and/or plastic.

Prime wall:

Wall should be covered with one of the following primers:

1. American Clay Earth Plaster Primer

2. PVA (polyvinyl acetate) concrete or plaster bonder, such as El Rey Gypsum Bond, USG Plaster Bonder or Omega PVA Bonder. Sharp mason’s sand (#30 or smaller) should be added to PVA primers around cornerbeads, trim and other vulnerable areas. Please note: most PVA primers must be plastered within 2 hours -14 days after they are applied, depending on the primer used.

3. A good quality wall primer mixed with 2 cups sharp mason’s sand (#30 or smaller) per gallon.

All of these primers may be brushed, rolled or sprayed on. Any sanded primer (including the American Clay primer) that is sprayed on must be backrolled.

Mix Plaster:

Each 50 lb. container of American Clay is mixed with approximately two gallons of water. You may need a bit more or a bit less of the water to bring the plaster to the correct consistency (similar to pudding).

Start by measuring 1 & 3/4 gallons of water into a five gallon bucket or a wheelbarrow. Slowly pour in one 50 lb. container of American clay. Let this sit for five minutes.

If you have a separate pigment, add 1 cup or more of the remaining water to the pigment container and stir well to create a smooth, thick paste. Empty the paste onto the soaking plaster, rinse the container with a bit of the water, and add it to the soaking plaster also.

Mix with a drill and plaster paddle or a hoe. Continue to add water and mix thoroughly until the color is even and the plaster is the consistency of pudding. (You may need slightly less or slightly more water than the two gallons).

For best results, allow the plaster to stand for 30 minutes before using. Workability improves with age, and additional water may be added to return thickened or dried plaster to a pudding consistency.

General Application:

The recommended application is two thin coats to create a combined thickness of 1/16 to 1/8 of an inch.

Apply the first thin coat of American Clay Earth Plaster with a trowel. Leave sufficient texture for the second coat to key in to the first coat. Let dry a minimum of 12 hours.

Lightly mist the first coat with water and apply the second thin coat. Let dry a minimum of 12 hours.

Finishing an earthen plaster is probably the most important step. After drying, the second coat may be finished by rubbing it with a barely-damp sponge or by lightly misting the surface and working it with a stainless steel trowel, rubber float or horsehair brush. This compacts and strengthens the surface, reduces trowel marks and preventing dusting. Additional finishing techniques special effects are demonstrated on the American Clay video.

Clean Up:

Tools can be cleaned up with water. Unused wet plaster can be laid out to dry. It may be rehydrated at a later date, mixed thoroughly, and used for touchups.

Sealing:

It is not necessary to seal this plaster except in areas that are regularly exposed to  splashing water (around sinks, bathtubs and shower stalls) or splattering oils (behind stoves).

Recommended sealers include paste waxes such as Trewax or Bioshield Floor and Furniture Hardwax, liquid potassium (water glass) products such as AFM Safecoat Penetrating Waterstop, and acrylic masonry sealers such as Okon W-1.